pepar

1-THE PLAN

2-PAINTING

3-FALSE WALL

5-AUDIO SNAKE

6-WALL CARPET

8-PROJECTOR

10-RISER

14-CNTR SPKR MASKING

15-CEILING ABSORBER (FRAME)

16-BUILDING ABSORBERS

19-COMPLETING CEILING ABSORBER

20-BUILDING HTPC

21-EXPANDING 8300HD STORAGE

23 - INSTALLING BASS TRAPS

26 - INSTALLING & ALIGNING LCR SPKRS

27 - RECONFIGURING THE FALSE WALL FOR THE NEW 2.35:1 SCREEN

Pg 17 - Cutting & inserting the fiberglass pg 2
wall frp 65/2/05 - Here is a close-up of the frame. To achieve a smooth, professional look, I rounded the corners. This will also make it easier to stretch the GOM fabric.
wall frp 75/2/05 - The unpainted inside of the frame is visible in some places. So as not to have this show through the finished panels, it needs to be painted.
wall frp 85/2/05 - I’ve painted inside edges where exposed.
wall frp 95/2/05 - Glued, trimmed, touched up and ready for the fabric.

CONTINUED ON NEXT PAGE

© 2003 - 2010 All rights reserved.