pepar

1-THE PLAN

2-PAINTING

3-FALSE WALL

5-AUDIO SNAKE

6-WALL CARPET

8-PROJECTOR

10-RISER

14-CNTR SPKR MASKING

15-CEILING ABSORBER (FRAME)

16-BUILDING ABSORBERS

19-COMPLETING CEILING ABSORBER

20-BUILDING HTPC

21-EXPANDING 8300HD STORAGE

23 - INSTALLING BASS TRAPS

26 - INSTALLING & ALIGNING LCR SPKRS

27 - RECONFIGURING THE FALSE WALL FOR THE NEW 2.35:1 SCREEN

Pg 7 - Wall carpet installation details
wall carpet 7Here I am applying carpeting/accent molding on the right and rear walls.  First, I layout and attach the molding and then the carpet.
wall carpet 8This shot shows the side wall carpeted and the rear wall carpet held in place temporarily.
wall carpet 9Here I have folded the carpet and tacked it so that I can apply the adhesive.
wall carpet 10The carpet is now glued and trimmed.  Applying the carpet has been the messiest and most difficult part of this project.

© 2003 - 2010 All rights reserved.